Mining

New Construction
  • New construction
  • Additions and upgrades
  • Maintenance  and Turnarounds
  • HDPE Piping fusing and Installation
     
Equipment Setting & Assembly
  • Assemble and setting of Conveyors
  • Piping fabrication
  • Assembly of Structural and piping
  • Hydro testing
  • Electrical & Instrumentation
Pipe fabrication
  • The capability of fabricating 10,000 to 15,000 FDWI per month.
  • Hydro testing and coating
  • Certified in both ASME B31.3 & B31.1
  • CSA Z662 Certification
Structural Fabrication
  • Capacity of 250,000 Lbs per month
  • Certified to div. 2 with CWB for both SMAW and FCWA.
  • CSA W47.1 and CSA W59.1 Codes
  • NDE and coating as required.